Product changelog

What changed in each paid pack, when, and why. A change to what the law says, to a deadline calculation, or to a model letter increments the version and is recorded here. Typographical fixes and formatting changes do not.

If you have bought a pack, you are entitled to later revisions within the same major version at no charge. Email us from the address you used at checkout and we will send the current file. The terms of sale set out how that works, and the methodology page explains the review process behind these updates.

Awaab's Law Compliance Pack

/compliance-pack · £24.99

Price change

Price reduced from £29.99 to £24.99. The document itself is unchanged.

  • New price £24.99, previously £29.99. Takes effect from 11 September 2026 for new purchases.
  • No version increment: nothing in the file changed. Buyers holding the current version hold the current version.
Version 7.0

Corrects the Phase 2 commencement date throughout the pack. A regulatory amendment, so a major version.

  • Phase 2 of Awaab's Law was previously described as expected from October 2026, with the commencement instrument not yet laid. That position was superseded. The amending regulations were laid before Parliament in draft on 13 July 2026, and the Ministry of Housing, Communities and Local Government published 30 November 2026 as the commencement date.
  • The cover, the phase-status note and the closing page now give 30 November 2026 as the commencement date, and no longer describe it as expected.
  • The phase-status note no longer says Phase 2 is not in force “unless and until it is commenced”, which read as open-ended. It now names the date and says the duties do not apply before it.
  • Extent is unchanged at 35 pages in 8 parts. No form, log or template letter was altered.

Awaab's Law Phase 2 Extension Pack

/phase-2-pack · £24.99

Price change

Price reduced from £29.99 to £24.99. The document itself is unchanged.

  • New price £24.99, previously £29.99. Takes effect from 11 September 2026 for new purchases.
  • No version increment: nothing in the file changed. Buyers holding the current version hold the current version.
Version 7.0

Corrects the Phase 2 commencement date, and re-dates the worked example that depended on it.

  • Phase 2 of Awaab's Law was previously described as expected from October 2026, with the commencement instrument not yet laid. That position was superseded. The amending regulations were laid before Parliament in draft on 13 July 2026, and the Ministry of Housing, Communities and Local Government published 30 November 2026 as the commencement date.
  • Every statement of the commencement date was corrected, including the cover, the running header material, the Phase 1 versus Phase 2 comparison table, the hazard reference guide, the tenant information sheet and the regulation update summary.
  • The secondary-legislation summary no longer says the instrument has not been laid. It records that the draft was laid on 13 July 2026, that it is subject to the affirmative procedure, and that it had not yet been made at the date of the pack.
  • The statutory-basis row of the Part 2 comparison table said the new SI was “not yet published”. It now names the amending regulations and gives the date they were laid in draft. This row matters because the pack tells teams to share that table at team meetings.
  • Worked Example 1 was dated 6 October 2026, which now falls before commencement. It moves to a report date of Tuesday 1 December 2026, and every deadline in its table was recalculated from that date: investigation by Tue 15 Dec 2026, written summary by Fri 18 Dec 2026, safety work by Tue 22 Dec 2026, Reg 13(2) begin-by Tue 22 Dec 2026, and the Reg 13(3)(b) backstop Tue 9 Mar 2027.
  • Extent is unchanged at 43 pages in 12 parts plus the Regulation 9 letter template.

Awaab's Law Tenant Action Pack

/tenant-action-pack · £9.99

Price change

Price reduced from £19.99 to £9.99. The document itself is unchanged.

  • New price £9.99, previously £19.99. Takes effect from 11 September 2026 for new purchases.
  • No version increment: nothing in the file changed. Buyers holding the current version hold the current version.
v2.0

Corrects the Phase 2 status in the cover guide and in the letters file.

  • Phase 2 of Awaab's Law was previously described as expected from October 2026, with the commencement instrument not yet laid. That position was superseded. The amending regulations were laid before Parliament in draft on 13 July 2026, and the Ministry of Housing, Communities and Local Government published 30 November 2026 as the commencement date.
  • The phase-status section and the Phase 2 callout in the cover guide now give 30 November 2026, and record that the amending regulations were laid in draft on 13 July 2026 and still require parliamentary approval.
  • The statement that the commencement instrument had not been laid was removed from the cover guide.
  • The phase-status paragraph in the letters file was corrected to match.
  • Extent is unchanged: an 11-page cover guide and 11 letters. No letter wording was altered, so a letter drafted from v1.5 remains valid.

Awaab's Law Compliance Bundle

/bundle · £39.99

The bundle is the Compliance Pack and the Phase 2 Extension Pack. Its changelog is theirs, above.

Price change

Price reduced from £49.99 to £39.99. The document itself is unchanged.

  • New price £39.99, previously £49.99. Takes effect from 11 September 2026 for new purchases.
  • No version increment: nothing in the file changed. Buyers holding the current version hold the current version.
  • The two packs bought separately now come to £49.98, so the bundle saving stays at £9.99.
Version 7.0

Both packs in the bundle moved to Version 7.0 on this date.

  • Delivered as the Compliance Pack 7.0 and the Phase 2 Extension Pack 7.0. See the entries for each above.
  • Extent is unchanged at 78 pages across the two files.

Before these versions

This changelog starts at the versions above. Earlier revisions to the packs predate it and are recorded in the review log on the methodology page, which carries every substantive change made across the site.