Phase 2 · In force 30 November 2026

Awaab’s Law Phase 2 compliance tools and suppliers

What each hazard requires of a social landlord, with the equipment and suppliers that fit it. For repair and compliance teams and their contractors.

These are the tools and suppliers that repair and compliance teams use for Awaab’s Law Phase 2, hazard by hazard. Phase 2 comes into force on 30 November 2026. Parliament approved the amending regulations on 20 October 2026 (Lords 14 October). It adds seven hazard groups to the significant-hazard deadlines that have applied to damp and mould since 27 October 2025. Emergency hazards of every kind have been covered since then too.

The clock is the same for every hazard. Emergencies are investigated and made safe within 24 hours. Other reports are investigated within 10 working days, with a written summary within 3 working days and safety work within 5, both counted from the end of the investigation. Each section says what Phase 2 requires, drawing on the Government’s triage guidance, then lists equipment and suppliers. The Phase 2 guide covers the law, the timescales guide and deadline calculator work out the dates, and the Phase 2 Extension Pack has the triage forms.

How this page is put together

Equipment links go to Amazon UK and are affiliate links: we may earn a commission, at no extra cost to you. Suppliers are listed alphabetically, with one line from their own website, and are not ranked or endorsed. Paid listings are labelled “Ad”, and paying does not change the alphabetical order. We count clicks on supplier links, not who made them.

Damp and mould

In force since 27 October 2025

What the law requires

Already in force. The landlord must find and fix the cause, such as a leak, a failed extractor fan, a cold bridge or missing insulation. Government guidance says it is unacceptable for a social landlord to assume the tenant’s lifestyle is to blame. From 30 November 2026, a hazard is significant if a reasonable landlord would make it safe within 15 working days. That is a test, not a new deadline.

Emergency, 24 hours: Where the tenant is particularly vulnerable or already has symptoms, such as damp worsening a child’s asthma.

Out of scope: Small isolated patches, such as mould on grout, where serious harm is unlikely.

Advertise here: get in touch

Excess cold

Phase 2 · in force 30 Nov 2026

What Phase 2 requires

A home that cannot be heated, or kept at a safe temperature, because of a defect in the heating or insulation. It is significant where the tenant is likely to suffer serious ill health if it is not fixed in time, above all in colder periods.

Emergency, 24 hours: A complete loss of heating in cold weather. Make it safe within 24 hours, for instance with temporary heaters.

Out of scope: Tenants’ energy bills, which are not the landlord’s responsibility.

Advertise here: get in touch

Excess heat

Phase 2 · in force 30 Nov 2026

What Phase 2 requires

A home that overheats because of a defect, or where a defect such as a window that will not open makes hot weather worse.

Emergency, 24 hours: Where the tenant is in a heat-vulnerable group or already suffering serious heat-related effects.

Out of scope: Overheating caused only by high outside temperatures, and whole-block climate adaptation such as fitting shutters.

Advertise here: get in touch

Falls

Phase 2 · in force 30 Nov 2026

What Phase 2 requires

Falls on the level, on stairs and between levels, including in baths and showers, where the condition of the home makes a fall likely.

Emergency, 24 hours: Broken balcony railings.

Out of scope: Everyday slips and trips that no defect made worse, and falls from misusing ladders, steps or furniture.

Advertise here: get in touch

Structural collapse and falling elements

Phase 2 · in force 30 Nov 2026

What Phase 2 requires

Ceilings, floors, balconies, walls and external features that could collapse or fall. Large areas of ceiling plaster at risk of falling, and rotten floors, are significant examples.

Emergency, 24 hours: Sudden or fast-growing cracks, and leaning walls.

Out of scope: Superficial render cracks. Known weaknesses of a construction type, such as Large Panel System blocks, still need assessing but fall outside Awaab’s Law timescales.

Equipment

Suppliers and trade bodies

No specialist listing. Track these reports in a repairs system.

Advertise here: get in touch

Fire and explosions

Phase 2 · in force 30 Nov 2026

What Phase 2 requires

Fire and explosion hazards inside the home. The guidance expects most reports to be emergencies.

Emergency, 24 hours: Missing or failing smoke alarms, an escape route a defect has made unusable, and any risk of a gas explosion.

Out of scope: Fire hazards in the common parts of a block of flats, and in its structure and external walls. Risks that are not building defects, such as stored e-scooters.

Advertise here: get in touch

Electrical hazards

Phase 2 · in force 30 Nov 2026

What Phase 2 requires

Electrical hazards that are part of the building. A deteriorated installation that needs remedial work is a significant example. The guidance expects a qualified electrician to investigate.

Emergency, 24 hours: Exposed live parts and damaged sockets. The guidance expects many electrical hazards to be emergencies.

Out of scope: Tenants’ own appliances, which are not part of the building.

Advertise here: get in touch

Domestic and personal hygiene, food safety and pests

Phase 2 · in force 30 Nov 2026

What Phase 2 requires

Pests and refuse, personal hygiene, sanitation and drainage, and food safety. Ongoing pests linked to a building defect or poor refuse storage are a significant example, and so are unreliable toilet or washing facilities.

Emergency, 24 hours: A serious infestation, raw sewage escaping, or losing the use of a toilet or washing facilities.

Out of scope: General clutter with no build-up of rubbish or pests.

Advertise here: get in touch

All hazards: repairs and housing systems

Applies to every hazard above

Systems that log and track repair reports for any hazard, listed alphabetically.

Repairs and housing systems

Advertise here: get in touch

Questions about Phase 2 tools and suppliers

When does Awaab’s Law Phase 2 come into force?

Phase 2 comes into force on 30 November 2026. Parliament approved the amending regulations on 20 October 2026 (Lords 14 October). Until then the Phase 1 rules apply: damp and mould, plus emergency hazards of any kind.

Which hazards does Phase 2 add?

Seven groups: excess cold, excess heat, falls, structural collapse and falling elements, fire and explosions, electrical hazards, and domestic and personal hygiene, food safety and pests. Fire risks from the structure, external walls and common parts of a block of flats are excluded. Damp and mould stay in scope. The remaining hazards, except overcrowding, are expected in Phase 3 in 2027.

Do the deadlines change in Phase 2?

No. Every hazard in scope runs on the same clock: emergencies investigated and made safe within 24 hours, other reports investigated within 10 working days, a written summary within 3 working days and safety work within 5. What changes is the definition. A hazard is significant if a reasonable landlord would make it safe within 15 working days. That is a test of seriousness, not a 15-day deadline.

Does Phase 2 apply to private landlords?

No. Awaab’s Law applies to social housing let on a tenancy by a registered provider, which means councils and housing associations. Extending it to private renting needs further regulations, and none are in force yet.

Will buying these tools make a landlord compliant?

No. Compliance means meeting each duty in time and being able to show it. A meter or logger helps an investigator measure and record what they find, and repairs software helps track the dates, but no product meets the duty for you. The Government’s guidance recommends keeping a record of every action taken under Awaab’s Law.

More on the dates: Awaab’s Law Phase 2 and timescales explained.

Suppliers: advertise in a Featured slot at the top of one hazard section.

In social housing in England, Awaab’s Law Phase 2 brings seven more hazard groups under the same deadlines from 30 November 2026.

Awaab's Law deadlines at a glance

Emergency
24 hours
Investigation
10 working days
Preventative work
begin in 5 working days

The pack

Phase 2 Extension Pack

Expanded hazard triage for the seven Phase 2 hazard groups, a Phase 2 inspection record, the deadline timeline with worked examples, and a readiness checklist. Instant PDF download.

£24.9942 pages. One-time payment.

Free Deadline Calculator

Enter the report date and get every statutory deadline that follows from it.