Phase 2 · In force 30 November 2026
Awaab’s Law Phase 2 compliance tools and suppliers
What each hazard requires of a social landlord, with the equipment and suppliers that fit it. For repair and compliance teams and their contractors.
These are the tools and suppliers that repair and compliance teams use for Awaab’s Law Phase 2, hazard by hazard. Phase 2 comes into force on 30 November 2026. Parliament approved the amending regulations on 20 October 2026 (Lords 14 October). It adds seven hazard groups to the significant-hazard deadlines that have applied to damp and mould since 27 October 2025. Emergency hazards of every kind have been covered since then too.
The clock is the same for every hazard. Emergencies are investigated and made safe within 24 hours. Other reports are investigated within 10 working days, with a written summary within 3 working days and safety work within 5, both counted from the end of the investigation. Each section says what Phase 2 requires, drawing on the Government’s triage guidance, then lists equipment and suppliers. The Phase 2 guide covers the law, the timescales guide and deadline calculator work out the dates, and the Phase 2 Extension Pack has the triage forms.
How this page is put together
Equipment links go to Amazon UK and are affiliate links: we may earn a commission, at no extra cost to you. Suppliers are listed alphabetically, with one line from their own website, and are not ranked or endorsed. Paid listings are labelled “Ad”, and paying does not change the alphabetical order. We count clicks on supplier links, not who made them.
Damp and mould
What the law requires
Already in force. The landlord must find and fix the cause, such as a leak, a failed extractor fan, a cold bridge or missing insulation. Government guidance says it is unacceptable for a social landlord to assume the tenant’s lifestyle is to blame. From 30 November 2026, a hazard is significant if a reasonable landlord would make it safe within 15 working days. That is a test, not a new deadline.
Emergency, 24 hours: Where the tenant is particularly vulnerable or already has symptoms, such as damp worsening a child’s asthma.
Out of scope: Small isolated patches, such as mould on grout, where serious harm is unlikely.
Equipment
- Protimeter SurveyMaster (Bluetooth) (affiliate)Moisture meter that logs readings to an app. (opens in a new tab)
- Govee WiFi Hygrometer (affiliate)Humidity monitor with app alerts. (opens in a new tab)
- FLIR C5 Thermal Camera (affiliate)Pocket thermal camera with Wi-Fi upload. (opens in a new tab)
More, including PIV units and dehumidifiers: damp and mould equipment.
Suppliers and trade bodies
- Aico HomeLINK (opens in a new tab)
Connected sensors with damp case management.
- Switchee (opens in a new tab)
Smart thermostats and in-home sensor data.
Excess cold
What Phase 2 requires
A home that cannot be heated, or kept at a safe temperature, because of a defect in the heating or insulation. It is significant where the tenant is likely to suffer serious ill health if it is not fixed in time, above all in colder periods.
Emergency, 24 hours: A complete loss of heating in cold weather. Make it safe within 24 hours, for instance with temporary heaters.
Out of scope: Tenants’ energy bills, which are not the landlord’s responsibility.
Equipment
- Elitech RC-5+ Data Logger (affiliate)USB temperature logger, PDF and CSV export. (opens in a new tab)
- Bosch UniversalTemp Thermometer (affiliate)Non-contact surface thermometer. (opens in a new tab)
Suppliers and trade bodies
- Switchee (opens in a new tab)
Smart thermostats and in-home sensor data.
Excess heat
What Phase 2 requires
A home that overheats because of a defect, or where a defect such as a window that will not open makes hot weather worse.
Emergency, 24 hours: Where the tenant is in a heat-vulnerable group or already suffering serious heat-related effects.
Out of scope: Overheating caused only by high outside temperatures, and whole-block climate adaptation such as fitting shutters.
Equipment
- Elitech RC-51H Data Logger (affiliate)USB temperature and humidity logger. (opens in a new tab)
- TempPro TP357 Hygrometer (affiliate)Room temperature monitor with history. (opens in a new tab)
Suppliers and trade bodies
- Switchee (opens in a new tab)
Smart thermostats and in-home sensor data.
Falls
What Phase 2 requires
Falls on the level, on stairs and between levels, including in baths and showers, where the condition of the home makes a fall likely.
Emergency, 24 hours: Broken balcony railings.
Out of scope: Everyday slips and trips that no defect made worse, and falls from misusing ladders, steps or furniture.
Equipment
- Bosch GIM 60 Inclinometer (affiliate)Digital level for stair and floor angles. (opens in a new tab)
- Bosch GLM 40 Laser Measure (affiliate)Laser measure to 40m, ±1.5mm. (opens in a new tab)
- UNI-T UT383 Light Meter (affiliate)Lux meter for stair and landing lighting. (opens in a new tab)
Suppliers and trade bodies
No specialist listing. Track these reports in a repairs system.
Structural collapse and falling elements
What Phase 2 requires
Ceilings, floors, balconies, walls and external features that could collapse or fall. Large areas of ceiling plaster at risk of falling, and rotten floors, are significant examples.
Emergency, 24 hours: Sudden or fast-growing cracks, and leaning walls.
Out of scope: Superficial render cracks. Known weaknesses of a construction type, such as Large Panel System blocks, still need assessing but fall outside Awaab’s Law timescales.
Fire and explosions
What Phase 2 requires
Fire and explosion hazards inside the home. The guidance expects most reports to be emergencies.
Emergency, 24 hours: Missing or failing smoke alarms, an escape route a defect has made unusable, and any risk of a gas explosion.
Out of scope: Fire hazards in the common parts of a block of flats, and in its structure and external walls. Risks that are not building defects, such as stored e-scooters.
Equipment
- Kidde 5CO CO Alarm (affiliate)Battery CO alarm with a 10-year sensor. (opens in a new tab)
- Arctic Hayes Smoke Alarm Tester (affiliate)Aerosol that mimics smoke to test alarms. (opens in a new tab)
Suppliers and trade bodies
- BAFE (opens in a new tab)
Register of certificated fire safety firms.
Electrical hazards
What Phase 2 requires
Electrical hazards that are part of the building. A deteriorated installation that needs remedial work is a significant example. The guidance expects a qualified electrician to investigate.
Emergency, 24 hours: Exposed live parts and damaged sockets. The guidance expects many electrical hazards to be emergencies.
Out of scope: Tenants’ own appliances, which are not part of the building.
Equipment
- Martindale CP501 Socket Tester (affiliate)Shows UK socket wiring faults on 3 LEDs. (opens in a new tab)
- Kewtech KEWCHECK103 Tester (affiliate)Checks how a mains socket is wired. (opens in a new tab)
Suppliers and trade bodies
- NAPIT (opens in a new tab)
Certification body with a member search.
- NICEIC (opens in a new tab)
Electrical certification body with a firm search.
Domestic and personal hygiene, food safety and pests
What Phase 2 requires
Pests and refuse, personal hygiene, sanitation and drainage, and food safety. Ongoing pests linked to a building defect or poor refuse storage are a significant example, and so are unreliable toilet or washing facilities.
Emergency, 24 hours: A serious infestation, raw sewage escaping, or losing the use of a toilet or washing facilities.
Out of scope: General clutter with no build-up of rubbish or pests.
Equipment
- Rentokil Insect Traps (3 pack) (affiliate)Poison-free traps for crawling insects. (opens in a new tab)
- Rentokil Bed Bug Traps (2 pack) (affiliate)Traps to detect and monitor bed bugs. (opens in a new tab)
Suppliers and trade bodies
- British Pest Control Association (BPCA) (opens in a new tab)
Pest control association with a member search.
All hazards: repairs and housing systems
Systems that log and track repair reports for any hazard, listed alphabetically.
Repairs and housing systems
- Civica (opens in a new tab)
Cx Housing management software.
- Fixflo (opens in a new tab)
Repairs and maintenance management software.
- Joblogic (opens in a new tab)
Field service software for UK trades.
- MRI Software (opens in a new tab)
Software for housing associations and councils.
- Plentific (opens in a new tab)
Work order and contractor management.
- Simpro (opens in a new tab)
Field service software for trades.
Questions about Phase 2 tools and suppliers
When does Awaab’s Law Phase 2 come into force?
Phase 2 comes into force on 30 November 2026. Parliament approved the amending regulations on 20 October 2026 (Lords 14 October). Until then the Phase 1 rules apply: damp and mould, plus emergency hazards of any kind.
Which hazards does Phase 2 add?
Seven groups: excess cold, excess heat, falls, structural collapse and falling elements, fire and explosions, electrical hazards, and domestic and personal hygiene, food safety and pests. Fire risks from the structure, external walls and common parts of a block of flats are excluded. Damp and mould stay in scope. The remaining hazards, except overcrowding, are expected in Phase 3 in 2027.
Do the deadlines change in Phase 2?
No. Every hazard in scope runs on the same clock: emergencies investigated and made safe within 24 hours, other reports investigated within 10 working days, a written summary within 3 working days and safety work within 5. What changes is the definition. A hazard is significant if a reasonable landlord would make it safe within 15 working days. That is a test of seriousness, not a 15-day deadline.
Does Phase 2 apply to private landlords?
No. Awaab’s Law applies to social housing let on a tenancy by a registered provider, which means councils and housing associations. Extending it to private renting needs further regulations, and none are in force yet.
Will buying these tools make a landlord compliant?
No. Compliance means meeting each duty in time and being able to show it. A meter or logger helps an investigator measure and record what they find, and repairs software helps track the dates, but no product meets the duty for you. The Government’s guidance recommends keeping a record of every action taken under Awaab’s Law.
More on the dates: Awaab’s Law Phase 2 and timescales explained.
Suppliers: advertise in a Featured slot at the top of one hazard section.
In social housing in England, Awaab’s Law Phase 2 brings seven more hazard groups under the same deadlines from 30 November 2026.
Awaab's Law deadlines at a glance
- Emergency
- 24 hours
- Investigation
- 10 working days
- Preventative work
- begin in 5 working days
The pack
Phase 2 Extension Pack
Expanded hazard triage for the seven Phase 2 hazard groups, a Phase 2 inspection record, the deadline timeline with worked examples, and a readiness checklist. Instant PDF download.
Free Deadline Calculator
Enter the report date and get every statutory deadline that follows from it.