Awaab’s Law hazards by phase
Which hazards Awaab’s Law covers, from which date, and what a social landlord must do about each.
Last reviewed: How we check
The short answer
- Phase 1
- Awaab’s Law has covered damp and mould, and emergency hazards of any type except overcrowding, in social housing in England since 27 October 2025 (Phase 1, SI 2025/1042).
- Phase 2
- From 30 November 2026, Phase 2 adds seven new hazard categories (nine of the 21 hazards in the amended HHSRS): excess cold, excess heat, falls, structural collapse and falling elements, fire and explosions, electrical hazards and domestic hygiene.
- Phase 3
- Phase 3, for the remaining hazards apart from overcrowding, is planned for 2027; private landlords are not covered, and the Government’s consultation on extending the law to them closes on 18 December 2026.
Every hazard, by phase
The hazards are those in Schedule 1 to the Housing Health and Safety Rating System (HHSRS) Regulations, which SI 2026/571 cut from 29 to 21 on 23 June 2026. The duties apply to social landlords in England: housing associations and councils.
| Hazard | What the landlord must do | Deadline |
|---|---|---|
| Phase 1In force since 27 October 2025 | ||
| Damp and mouldHHSRS paragraph 1 · Phase 1 | The landlord must find and fix the cause, such as a leak, a failed extractor fan, a cold bridge or missing insulation. | DeadlineEmergency: investigate and make safe within 24 hours. Significant: investigate within 10 working days. |
| Emergency hazards of any HHSRS typeEvery hazard except crowding and space · Phase 1 | Investigate and make safe within 24 hours of having reasonable grounds to believe there is an emergency hazard. | Deadline24 hours (regulation 5). |
| Phase 2In force from 30 November 2026DeadlineEmergency: investigate and make safe within 24 hours. Significant: investigate within 10 working days. | ||
| Excess coldHHSRS paragraph 2 · Phase 2 | A home that cannot be heated, or kept at a safe temperature, because of a defect in the heating or insulation. It is significant where the tenant is likely to suffer serious ill health if it is not fixed in time, above all in colder periods. | Emergency: investigate and make safe within 24 hours. Significant: investigate within 10 working days. |
| Excess heatHHSRS paragraph 3 · Phase 2 | A home that overheats because of a defect, or where a defect such as a window that will not open makes hot weather worse. | |
| Falls (on the level, on stairs, between levels)HHSRS paragraphs 18A, 21 and 22 · Phase 2 | Falls on the level, on stairs and between levels, including in baths and showers, where the condition of the home makes a fall likely. | |
| Structural collapse and falling elementsHHSRS paragraph 29 · Phase 2 | Ceilings, floors, balconies, walls and external features that could collapse or fall. Large areas of ceiling plaster at risk of falling, and rotten floors, are significant examples. | |
| Fire and explosionsHHSRS paragraph 23A · Phase 2 | Fire and explosion hazards inside the home. The guidance expects most reports to be emergencies.ExcludedFire hazards in the common parts of a block of flats, and in its structure and external walls. Risks that are not building defects, such as stored e-scooters. | |
| Electrical hazardsHHSRS paragraph 23 · Phase 2 | Electrical hazards that are part of the building. A deteriorated installation that needs remedial work is a significant example. The guidance expects a qualified electrician to investigate. | |
| Domestic hygiene, including pestsHHSRS paragraph 14A · Phase 2 | Pests and refuse, personal hygiene, sanitation and drainage, and food safety. Ongoing pests linked to a building defect or poor refuse storage are a significant example, and so are unreliable toilet or washing facilities. | |
| Phase 3Planned for 2027; not yet law | ||
| The remaining HHSRS hazards, apart from overcrowdingNot yet listed in any regulations · Phase 3 | No new duty yet: no regulations have been laid. An emergency in any of these hazards is already covered under Phase 1. | DeadlineNone set. |
| NoneExcluded from every phase | ||
| OvercrowdingHHSRS paragraph 11, crowding and space · None | Overcrowding hazards are not in scope of Awaab's Law. This is not a temporary gap that a later phase will close. | DeadlineNot applicable. |
Excluded fire hazard
From 30 November 2026, a relevant hazard must be “a prescribed hazard that is not an excluded fire hazard”, for emergency hazards as well as significant ones: an excluded fire hazard is one where the risk of harm “is associated with exposure to uncontrolled fire and associated smoke and fumes” and “arises from a deficiency in a FSO-regulated part of a building that contains two or more sets of domestic premises”, meaning the parts the Fire Safety Order covers under its article 6(1A): “the building’s structure and external walls and any common parts” and “all doors between the domestic premises and common parts” (regulation 3(2), as amended).
Phase 2 comes into force on 30 November 2026. Parliament approved the amending regulations on 20 October 2026 (Lords 14 October). legislation.gov.uk still lists the amending regulations as a draft with no SI number; we will add it when it is published. For what each Phase 2 hazard covers, with emergency examples, see Phase 2 compliance tools and suppliers; for the law itself, the Phase 2 guide.
The deadlines, once a hazard is in scope
Every hazard in scope runs on the same statutory clock. Phase 2 does not change the deadlines; they are the ones Phase 1 set.
- Emergency hazards
- Investigate and make safe within 24 hours of having reasonable grounds to believe there is an emergency hazard.
- Investigation
- Within 10 working days of the landlord becoming aware, for a significant hazard.
- Written summary
- To the tenant within 3 working days, counted from the day after the investigation is completed (Reg 9).
- Safety work
- Completed within 5 working days, counted from the day after the investigation is completed, for a significant hazard.
- Preventative work
- Begun within 5 working days by default (Reg 13(2)); a 12-week backstop applies only where that is not reasonably practicable.
The free deadline calculator turns a report date into each of these as a calendar date. When the clock starts for an emergency is set out in the 24-hour rule guide.
Common questions
Which hazards are covered from 30 November 2026?
Damp and mould, emergency hazards of any type except overcrowding, and seven new hazard categories (nine of the 21 hazards in the amended HHSRS): excess cold, excess heat, falls, structural collapse and falling elements, fire and explosions, electrical hazards, and domestic hygiene including pests. Fire risks from the structure, external walls and common parts of a block of flats are excluded.
Which hazards does Awaab’s Law cover now?
Since 27 October 2025, Phase 1 has covered significant damp and mould hazards, and all emergency hazards (other than overcrowding), in social housing in England.
Do the deadlines change in Phase 2?
No. The 10, 3 and 5 working-day clocks and the 24-hour emergency duty stay the same. What changes is the definition of a significant hazard: from 30 November 2026, it becomes a risk a reasonable landlord would make safe within 15 working days. That is part of the definition, not a new deadline.
What is Phase 3?
Phase 3 is the Government’s plan to bring the remaining HHSRS hazards, apart from overcrowding, under Awaab’s Law. It is planned for 2027. No date has been set and no regulations have been laid, so Phase 3 is a policy commitment, not law.
Does Awaab’s Law apply to private landlords?
No. Awaab’s Law, Phase 2 included, applies to social housing in England: housing associations and councils. The Renters’ Rights Act 2025 gives the Government a power to extend it to private renting. The Government’s consultation closes on 18 December 2026; the earliest feasible start is 2027, and no date has been set. Private tenants can still ask the council’s environmental health team to inspect.
Is overcrowding covered?
No. Overcrowding is outside Awaab’s Law (Reg 3 / Reg 5). Overcrowding hazards are not in scope of Awaab's Law. This is not a temporary gap that a later phase will close.
Tools, packs and sources
- Phase 2 Extension Pack · £19.99Triage framework and inspection record for the seven new hazard categories.
- Compliance Pack · £19.99The Phase 1 damp and mould toolkit.
- Compliance Bundle · £29.99Both landlord packs together.
- Deadline calculatorEvery statutory date from one report, free.
- SourcesThe legislation and official guidance behind this page, with dates.
Get an email when the rules change.
2 or 3 short updates a year. No spam.
In social housing in England, Awaab’s Law Phase 2 brings seven more hazard groups under the same deadlines from 30 November 2026.
Awaab's Law deadlines at a glance
- Emergency
- 24 hours
- Investigation
- 10 working days
- Preventative work
- begin in 5 working days
The pack
Phase 2 Extension Pack
Expanded hazard triage for the seven Phase 2 hazard groups, a Phase 2 inspection record, the deadline timeline with worked examples, and a readiness checklist. Instant PDF download.
Free Deadline Calculator
Enter the report date and get every statutory deadline that follows from it.